Recently, EB-LINK has completed special stocking of cross-machine room interconnection devices, covering 100G DAC, AOC active optical cables and single-mode long-distance optical modules, mainly serving inter-building and park computing power interconnection projects.
Why expand this category of devices?
In recent years, the computing power synergy and east-to-west computing direction that has attracted widespread attention in the industry have continued to advance. The demand for interconnection links in medium-sized data centers and campus computing power nodes has increased significantly, and the project side has experienced tighter delivery times for high-speed cables and long-distance modules. The company divides the stocking into three levels: intra-counter, cross-counter, and inter-floor, and expands the standing spot pool accordingly:
- Short distance inside the cabinet:100G DAC high speed cable, low latency and simple construction
- Inter-cabinet mid-distance: 25G and 40G AOC active optical cables to reduce cable management pressure
- Long distance between buildings: single-mode optical modules and jumpers, configured in pairs according to the link budget
What changes can the project get?
The most direct change is the delivery time: commonly used grades can be shipped from stock, and projects that are started intensively do not have to wait in series; each optical module is tested one by one before being shipped, and the distance grade mix is intercepted through unpacking and random inspection, and the acceptance data is also more worry-free. For procurement, alternative models and warehouse storage locations will be listed together in the quotation. Cables will be registered by length and can be shipped after being extracted. Temporary replacement parts will no longer occupy the critical construction period of the project.
Follow-up services and consultation channels
In the next step, the company will update based on this batch of stockingsData center high-speed interconnection solutionpage, and supplement the link budget table template, which is organized according to the actual building project conditions. If the project is in the planning or renovation evaluation stage, you can call 0755-83179002 to obtain a spot list and equivalent replacement comparison, and technical support will respond within working days.