Recently, EB-LINK completed the delivery of a batch of single-mode jumper cables and supporting equipment for the integrated wiring project of an office building in a high-tech park.Unlike previous whole box shipments, this batch of goods arrived according to the port list. With the goods, the factory inspection records were attached. The construction party's material inventory and pre-acceptance time were significantly shortened, which secured a window for subsequent full-scale retesting. Delivery revolves around
the last 200 meters of the all-optical network LC-LC single-mode
- dual-core jumper Multiple lengths of 1 to 5meters are stocked, covering the connection of floor ODF to the access device SC-SC single-mode single-core jumper Use
- with single-fiber bidirectional transceivers to save core resourcesArmored jumper wires are used in areas where it is easy to
- step on and bite the mouse, such as the jumper area in the machine room.
- Each jumper pre-pastes the length and polarity label, and the code can be scanned to
reconcile the storage Why Attach an Inventory
and Report In the park project, the jumper is often scattered in dozens of weak electric rooms. In the past, due to the inconsistent length, labels, and records, it was costly to count and retest during the acceptance stage.This time, EB-LINK only detects insertion losses one by one at the factory, and sorts and packs them according to the floor and port segments. It can be verified on-site according to the list. The test data is directly incorporated
into the completion data, and it
is no longer necessary to temporarily re-test and self-certify. Connection Tips for the Constructor It is recommended to confirm the ODF port type and target length before placing the order. The device side generally reserves 1 to 2 meters ofactivity to avoid jumper tension; the bending radius and label coding requirements can bereferred to High-tech campus office comprehensive wiring and all-optical network FTTH project In the implementation practice, the name and port number of
the weak current room are preferably aligned with the list caliber at the design stage. The goods have been handed over on-site, and the project team has entered the retest stage.Integrators who need the same type of packaged supply and inspection service can call the EB-LINK technical support team at 0755-83179002 and respond online on business days.