Multiple projects reported that the return trip took two to three weeks, squeezing out the cutover window. EB-LINK has recently implemented pre-shipment pre-acceptance in batch orders: customers can confirm in advance with full test data, and if necessary, engineers will go to the warehouse to accompany unpacking and random testing to prevent problems before shipment.

The test data is first confirmed by the customer and then packaged.

The individual test reports are issued before packing, and the fields are consistent with the physical batch, and will be shipped after confirmation. If certain parameters are inconsistent with the link design, the factory will directly change gears in the warehouse without having to ship the entire batch back. Keep another copy of the confirmed report version with the box to facilitate on-site verification. likeSFP 2.5G single mode dual fiber 20KM optical moduleThis type of convergence section uses commonly used stalls. It saves time to check the distance and loss budget in advance.

Unified method for accompanying random tests at the warehouse

For integrators who are cooperating for the first time, Wolflight supports technicians to bring standard instruments to the customer's warehouse for spot test demonstrations, and unifies test lines, wavelengths, judgment thresholds, and on-site handover methods. Accompanying the random test for about half a day, focusing on long-distance and paired equipment, the random test data is filled in the customer's acceptance ledger on the spot.

Retreats are reduced and disputes are moved forward

Judging from recent batches, the proportion of refunds has dropped, and most disputes are closed at the level of exchange and concession acceptance. The next step is to extend the pre-acceptance process to export batches and cooperate withSoutheast Asian operator 10G optical module and ODF batch delivery projectWait for the local acceptance habits of overseas projects to align the accompanying data with the on-site sampling tests.

Customers who need a pre-acceptance list or arrange for on-site spot testing support can call 0755-83179002, and sales will provide a blank acceptance ledger template at the same time, and can be scheduled according to the project.